Broadcom designs semiconductors but outsources most wafer fabrication, assembly, and test. Its 2025 annual report names the principal contractors and quantifies one dependency: Taiwan Semiconductor Manufacturing Company (TSMC) produced about 95% of the wafers made by Broadcom’s contract manufacturers during fiscal 2025.1
documented facts as of september 2026
wafer concentration: tsmc made about 95% of wafers produced by broadcom’s contract manufacturers in fiscal 2025
assembly and test: broadcom names tsmc, ase, foxconn, amkor, and spil among the contractors it uses
purchasing model: most manufacturing services and materials are bought by purchase order rather than long-term capacity contract
ai revenue: broadcom reported $16.7 billion for its fiscal third quarter of 20262
not disclosed: supplier allocation for a named custom accelerator, wafer volume, package yield, and unit cost
broadcom’s manufacturing model
Broadcom describes its model as primarily outsourced. External foundries make most front-end wafers. Contractors perform most assembly and test. Broadcom retains internal factories for some special processes, including radio-frequency filters and optical devices, but those facilities are not substitutes for leading-edge digital foundries.1
| stage | what broadcom discloses |
|---|---|
| wafer fabrication | mostly external; about 95% of contract-manufactured wafers came from tsmc in fiscal 2025 |
| assembly and test | significant majority outsourced; named contractors include tsmc, ase, foxconn, amkor, and spil |
| materials | hundreds of suppliers, with some unique or single-source parts |
| internal production | selected radio-frequency and optical semiconductor processes |
This is stronger evidence than an inferred “tier map.” A contractor named in Broadcom’s annual report is part of Broadcom’s company-wide supply chain. It does not follow that every contractor works on every custom AI accelerator.
wafer fabrication
Most advanced chips are designed for a specific manufacturing process at one foundry. Moving a design elsewhere can require physical redesign, new masks, qualification, reliability testing, and software validation. Broadcom says qualifying a new contract manufacturer is lengthy and expensive and may not succeed.1
The 95% TSMC figure measures wafers produced by Broadcom’s contract manufacturers across its semiconductor portfolio. It is not a TSMC market-share figure, and it does not reveal the foundry or process node for the OpenAI accelerator program.
assembly, test, and packaging
Broadcom names five assembly and test contractors in its 2025 annual report:
- Taiwan Semiconductor Manufacturing Company;
- Advanced Semiconductor Engineering (ASE);
- Foxconn Technology Group;
- Amkor Technology;
- Siliconware Precision Industries (SPIL).
Advanced AI systems may also need an interposer, high-bandwidth memory, large substrates, dense networking, and cooling hardware. Broadcom offers a 3.5D packaging platform called eXtreme Dimension System in Package (XDSiP). The company says it can combine more than 6,000 square millimeters of silicon and as many as 12 memory stacks.3
That platform is a capability, not proof of the package used by a named customer. Broadcom and OpenAI did not disclose a foundry, memory supplier, or package in their October 2025 announcement.
4materials and components
Broadcom purchases silicon and compound-semiconductor wafers, lead frames, metals, molding compounds, ceramic packages, chemicals, gases, components, and finished goods. Some inputs have no ready alternate because they are unique or expensive to qualify.1
Most purchases are made through purchase orders without a minimum quantity. That gives Broadcom flexibility, but it also leaves exposure to allocation, longer lead times, price changes, and a supplier’s decision to stop a part. Broadcom says it manages those risks through redesigns, additional inventory, lifetime purchases, and second-source qualification where possible.
equipment below the direct supplier tier
Broadcom’s named contractors rely on another chain of tool and material suppliers. TSMC needs lithography, deposition, etch, cleaning, inspection, and packaging equipment. HBM manufacturers need DRAM fabrication, thinning, vertical interconnect, bonding, and test tools.
These indirect dependencies matter, but they should not be presented as Broadcom vendors without evidence of a direct relationship. See the semiconductor equipment supplier overview for the manufacturing steps.
concentration and disruption risk
Broadcom’s filed risks include:
- a foundry allocating capacity to another customer;
- poor yield or delayed process development;
- a material or component supplier extending lead time or ending a product;
- trade restrictions and political conflict;
- natural disasters, power loss, logistics failures, and equipment problems;
- demand forecasts that leave too much or too little inventory.
The exposure is product-specific. A percentage such as “70% of critical suppliers are in East Asia” cannot be verified without defining “critical,” identifying the supplier set, and choosing whether the location means headquarters, factory, or sub-tier source. The old page supplied none of those definitions, so this revision removes that claim.
ai business scale
Broadcom reported $16.7 billion of AI-semiconductor revenue in its fiscal third quarter of 2026, up 221% from the prior-year quarter. It forecast $21.7 billion for the fourth quarter.2 The category includes custom accelerators and networking. It is not revenue from OpenAI alone.
OpenAI and Broadcom plan to deploy 10 gigawatts of accelerator and network systems beginning in the second half of 2026 and continuing through the end of 2029.4 Neither company published a chip count or fixed contract value. Converting gigawatts into chips requires a rack design and measured system power that are not public.
evidence note
The 2025 version of this page listed more than 50 companies, precise supplier shares, guaranteed wafers, long-term agreements, 18-to-24-month lead times, and a $500 million design cost. Much of that material came from market articles or inference rather than Broadcom disclosures. This revision keeps the dependencies Broadcom identifies and marks the limits of what those disclosures prove.
references
[1] Broadcom. (2025). Annual report on Form 10-K.
[2] Broadcom. (2026, September 2). Third-quarter fiscal 2026 results.